Our Projects

Our Projects

Our customer base is continuously growing at various industry levels such as large, medium and small sized businesses, residential and educational institutions. More and more companies are recognizing that installations commissioned by Sandhar ECCO Green not only help them save their recurring expenditures, but also ensure hassle free project management.

These customers have realized that Investing in solar energy makes a statement of an environmentally-friendly business and contributes towards improving the bottom lines.

INDIRA PARYAWARAN BHAWAN (940 KWp)

  • Among the first net-zero energy buildings in the country.
  • Using High efficiency panels.
  • 940KWp capacity installed in 6500 sq. mtr (only 65% of the usual space required)
  • Shadow areas reduced to 5% of the total floor area (usually 30%)
  • Using High efficiency panels
  • Comprehensive Data Monitoring system to enable data based fault detection down to 24 modules (from 2800+ modules)
indira-paryavaran-bhawan
omax-Auto-Binola-200kWp-2

AUTOMAX [Part of Omax Auto’s], Binola, Haryana

  • 200Kwp – Rooftop plant in Haryana
  • C-Si technology – 716 Modules of 280 Wp
  • String inverters – 10 each of 20KWp
  • Online Data monitoring system with Radiation and temperature Sensor
  • Plant synchronized to internal LT panel

OMAX AUTO LIMITED, BAWAL, HARYANA

  • 100Kwp – On pre-fab Industrial shed
  • C-Si technology – 380 Modules of 280 Wp
  • String inverters – 5 each of 20Kwp
  • Online Data monitoring system with Radiation and temperature Sensor
  • Plant synchronized to internal LT panel
omax-auto-limited-bhawan
indian-potash-limited

INDIA POTASH LIMITED

  • 60 KWp – Rooftop plant in Sikendarabad, UP
  • C-Si technology – 200 Modules of 300 Wp
  • String inverters – 2 each of 27.6 KWp
  • Online Data monitoring system with Radiation and temperature Sensor
  • Plant synchronized to internal LT panel

AMAR UJALA

  • 100 KWp – Rooftop plant in Agra, UP
  • C-Si technology – 336 Modules of 300 Wp
  • String inverters – 3 each of 33.3 KW
  • Online Data monitoring system with Radiation and temperature Sensor
  • Plant synchronized to internal LT panel
amar-ujala
hind-terminal

HIND TERMINAL (INDUSTRIAL SHED)

  • 105 KWp – Industrial Shed Plant in Palwal, NCR
  • C-Si technology – 352 Modules of 300 Wp
  • String inverters – 3 each of 33.3 KWp
  • Online Data monitoring system with Radiation and temperature Sensor
  • Plant synchronized to internal LT panel